
5 MW energy centre for Alexinsky quarry solid waste landfill located in Klin
2020 · Nominee
№2 «The best project in the field of small distributed power generation with a capacity of more than 5 MW»
Greentech Energy
5 MW energy centre for Alexinsky quarry solid waste landfill located in Klin
Moscow region
The energy centre is located in Klin, the Moscow region. It has been designed for energy supply to the modern Alexinsky quarry solid waste processing facility. Specially designed dual fuel GPU can work both on natural and landfill gases.
Project characteristics
- Electrical capacity
- 5 000 kW
- Generation type
- Gas piston power plants
- Configuration
- Containerized, Modular
- Fuel type
- Natural gas, Landfill gas
- Development type
- Industrial