
3,7 MW modular biogas fueled power station in Hallein, Austria (Schweighofer – BHKW 2 Hallein)
2020 · Winner
№1 «The best project in the field of small distributed power generation up to 5 MW», №3 «Best Renewable Energy, Storage and Electric Transportation Project»
MWM Austria GmbH
3,7 MW modular biogas fueled power station in Hallein, Austria (Schweighofer – BHKW 2 Hallein)
Salzburg
Schweighofer — BHKW 2 Hallein is the first biogas fueled power station built in Austria. The object has been built for AustroCel Hallein GmbH enterprise, a large producer of textile pulp located in Hallein, Austria. The capacity of the power station is 3,7 MW. Within the first year of operation the genset achieved the availability rate of 99,81%.
Project characteristics
- Electrical capacity
- 3 678 kW
- Generation type
- Gas piston power plants
- Configuration
- Modular
- Fuel type
- Biogas
- Development type
- Industrial