2024 · Nominee
№2 «The best project in the field of small distributed power generation with a capacity of more than 5 MW»
GC «TSS»
Diesel Power Center of 12.6 MW for the Oil Terminal at the «Bukhta Sever» Port (Dikson Settlement)
Krasnoyarsk
The oil terminal at the «Bukhta Sever» port is a strategic facility that will facilitate oil transshipment from the «Vostok Oil» fields along the Northern Sea Route and is set to become the largest in Russia by 2030. The power center, commissioned in April 2024, provides continuous energy supply to the terminal. The energy center comprises seven high-voltage diesel generators; an operator's module with two workstations managed by a proprietary SCADA system developed by TSS; and a block-modular 10 kV switchgear of «SEVER» design, also of domestic production.
Project characteristics
- Electrical capacity
- 12 600 kW
- Generation type
- Diesel power plants
- Configuration
- Modular
- Fuel type
- Diesel fuel
- Development type
- Industrial