2024 · Nominee
№2 «The best project in the field of small distributed power generation with a capacity of more than 5 MW»
LLC «TECHNOPARK Real-Invest»
Autonomous Energy Center of 22.8 MW with Capacity to Feed Electricity into the Grid in Nizhny Novgorod Region
Nizhniy Novgorod
The energy center provides electrical and thermal energy to both its own production and nearby enterprises. The facility received and fulfilled the technical requirements from the grid company to feed power into the grid (up to 4.3 MW). Since a large part of the energy center operates in «island» mode, issues arose with rapidly variable consumer loads. The engineers from the competing company found a solution by developing load modules with a capacity of 3 MW using fast-acting relays and designing and implementing software to control these load modules.
Project characteristics
- Electrical capacity
- 22 800 kW
- Generation type
- Gas piston power plants
- Configuration
- Modular
- Fuel type
- Natural gas
- Development type
- Industrial